Lake Champlain Bridge to Open Monday


The new bridge from Addison VT to Crown Point NY will open on Monday, November 7th. The bridge was closed abruptly two years ago after a routine bridge inspection found the span was unsafe. The bridge was demolished and replaced. A temporary free ferry service was operated during bridge construction. The bridge makes riding Vermont-Adirondack loop rides easier.

For more on the bridge, see this story in the Burlington Free Press.

  Brady Callahan Vermont Attorneys